01:16:57 0.2 |
LS PAN ATOMIC ENERGY COMMISSION NEVADA TEST
SITE |
01:17:11 14.2 |
CU CIVIL DEFENSE LOGO ON TRUCK. "OPERATION
CUE" |
01:17:36 39.2 |
WOMAN WALKING INTO CIVIL DEFENSE OPERATIONS
BUILDING, INTERIOR; OFFICIALS ON TELEPHONE. |
01:17:58 61.2 |
CU MODEL OF TEST SITE BUILDING, TRAILER
|
01:18:14 77.2 |
CONSTRUCTION WORKERS BUILDING ATOMIC BOMB
SHELTERS. CU SIMPLE SHELTER BUILT AGAINST BASEMENT WALL. CORNER ROOM BASEMENT SHELTER. |
01:18:58 121.2 |
VARIOUS ANGLES TEST HOUSE WITH BATHROOM AREA
SHELTER BUILT WITH RE-ENFORCED CONCRETE. WINDOWS COVERED. |
01:19:10 133.2 |
MS LINEMAN CLIMBING DOWN TELEPHONE, UTILITY POLE
LINEMAN REPAIRING WIRES ON UTILITY POLE |
01:19:45 168.2 |
TRANSFORMER SUBSTATION ERECTED ON TEST SITE
|
01:19:58 181.2 |
HARD HAT WALKING TO RADIO TOWER, SELF SUPPORTING
TOWER WITH NO GUY WIRES. |
01:20:09 192.2 |
MS TILT UP RADIO TOWER WITH SUPPORTING CABLES
|
01:20:15 198.2 |
ENGINEERS ADJUSTING RADIO TRANSMITTER
|
01:20:24 207.2 |
WORKERS ADJUSTING GAS TANKS. TECHNICAL EXPERTS
CHECKING EQUIPMENT |
01:20:42 226.2 |
WORKER SPRAYING 18,000 GALLON SUPPLY TANK
|
01:20:50 234.2 |
PAN WEIGHING & STORAGE HOUSE ON TEST SITE
|
01:20:58 242.2 |
AERIAL OVER TEST SITE, HOUSE
|
01:21:11 254.2 |
HOUSES TO BE TESTED IN ATOMIC BLAST; SINGLE STORY
FRAME RAMBLER, 2 STORY MASONRY WITH BASEMENT, SINGLE STORY RE-ENFORCED MASONRY HOUSE |
01:21:28 271.2 |
CONSTRUCTION WORKERS USING CRANE TO LIFT HUGE
SLABS OF PRE-CAST CONCRETE. WORKERS WELDING STEEL LUGS |
01:21:38 281.2 |
LS TWO STORY TEST HOUSE. MS PAINTER SEALING WINDOWS
|
01:21:49 293.2 |
AERIAL OVER TEST SITE HOUSES
|
01:21:56 300.2 |
WORKERS UNLOADING APPLIANCES FROM TRUCK. MOVING
MANNEQUINS TEST DUMMIES INTO HOUSE |
01:22:12 315.2 |
BOMB TEST SITE HOUSE, WORKER SETTING UP
MANNEQUINS IN HOUSE, IN BED. MAN DRESSING MANNEQUIN |
01:22:23 326.2 |
ROWS OF TEST SITE MANNEQUINS SET UP OUT IN THE
OPEN. CU DUMMIES |
01:22:41 344.2 |
CU ATOMIC FOOD TEST, BOX OF FOOD, CANNED GOODS,
PACKAGED FOODS |
01:22:54 358.2 |
MAN LEANING INTO REFRIGERATOR PUTTING FOOD IN
REFRIGERATOR, CLOSING THE DOOR |
01:23:01 364.2 |
PANTRY STOCKED WITH FOOD, SHELVES OF
FOOD |
01:23:13 376.2 |
CU MAN PACKING BOX, CRATE WITH FOOD, BURYING
BOXES OF FOOD ON TEST SITE & SETTING UP SOME CONTAINERS ABOVE GROUND |
01:23:43 406.2 |
EXT/NIGHT; MEDIA HILL, TELEVISION EQUIPMENT
BEING SET UP. CAMERAS ON TRIPODS. REPORTERS, COMMENTATORS, MILITARY & CIVIL DEFENSE OBSERVERS |
01:24:05 428.2 |
AT POSITION A MILE FORWARD FROM MEDIA HILL, CIVIL
DEFENSE FIELD EXERCISE GROUP SETTING UP. CU MAN IN TRUCK "CASUALTY CONTROL" ON TWO-WAY RADIO IN CAR. MS VAL PETERSON, FEDERAL DEFENSE ADMINISTRATOR. |
01:24:21 444.2 |
EXT/NIGHT: CIVIL DEFENSE VOLUNTEERS GOING INTO
TRENCH, GETTING INTO POSITION FOR BOMB |
01:24:31 454.2 |
ON MEDIA HILL, WORKERS FILLING COFFEE CUPS. MS
MAN PUTTING FILM INTO CAMERA |
01:24:42 465.2 |
CU LOUDSPEAKER WARNING "H MINUS ONE MINUTE, PUT
ON YOUR GOGGLES" |
01:24:46 469.2 |
MS GROUP OF VOLUNTEERS PUTTING ON SAFETY GOGGLES
CU MAN WEARING GOGGLES |
01:24:53 476.2 |
VOICE ON LOUDSPEAKER COUNTING DOWN TO BOMB, TEN,
NINE.. |
01:25:12 495.2 |
ATOMIC NUCLEAR FLASH, MUSHROOM CLOUD, BUILDINGS
BLOWN APART. RADIO TOWERS FALLING. ATOMIC BOMB TESTING. |
01:26:12 555.2 |
PEOPLE WALKING AROUND TEST SITE REVIEWING RESULTS
OF THE EXPLOSION. ATOMIC DEVASTATION, HOUSES WITHOUT RE-ENFORCED CONCRETE BLOCKS COMPLETELY DESTROYED, HOUSE WITH RE-ENFORCED CONCRETE BLOCKS STILL STANDING WITH MINOR DAMAGE |
01:27:02 605.2 |
HARD HAT IN BASEMENT SHELTER WITH SOME DAMAGE BUT
IN OVERALL GOOD SHAPE |
01:27:06 609.2 |
RE-ENFORCES BATHROOM SHELTER LEFT INTACT, REST OF
THE HOUSE DESTROYED |
01:27:20 623.2 |
PAN DAMAGED RADIO TOWERS
|
01:27:32 635.2 |
INTERIOR CONCRETE RADIO HOUSE, WORKERS PICKING
UP FALLEN EQUIPMENT, TRANSMITTER, TWO WORKERS SHAKE HANDS |
01:27:41 644.2 |
LS UNDAMAGED 18,000 GAS STORAGE TANK
|
01:27:54 657.2 |
LS WEIGHING & STORAGE TANKS SCATTERED ACROSS THE
DESERT, CONSUMER SIZED TANKS INTACT |
01:27:58 661.2 |
POWER LINES & TRANSFORMERS SUFFERED SOME DAMAGE
BUT STILL UP |
01:28:06 669.2 |
TWO WORKERS CHECKING POWER SUBSTATION, TESTING
LINES |
01:28:16 679.2 |
WORKERS PICKING UP BOXES OF FOOD FROM TEST SITE,
PUTTING IN BACK OF PICK UP TRUCK |
01:28:25 688.2 |
CU MANNEQUIN, DRESS LEFT TATTOO MARK ON
MANNEQUIN'S SLIP. CU MALE MANNEQUIN, HAND MOVES LAPEL, FADE MARK UNDERNEATH. SHOWING DAMAGE CAUSED BY ATOMIC BOMB |
01:28:43 706.2 |
PAN TEST SITE, MANY OBSERVERS BEING FED. LONG
LINE OF PEOPLE. MASS FEEDING. CU PEOPLE EATING FOOD ON TRAYS |
01:29:12 735.2 |
WOMAN WALKING AROUND TEST SITE, DEBRIS
|
01:29:28 751.2 |
HARD HATS CLEANING UP BOMB DEBRIS, CAREFULLY
MOVING "CASUALTY" MANNEQUIN |
01:29:43 766.2 |
LS ATOMIC BOMB, MUSHROOM CLOUD
|
01:30:03 786.2 |
TAPE ENDS
|
Description: JUNE TALON, REPORTER. "OPERATION CUE" ATOMIC, NUCLEAR POWER APPLICATIONS. CIVIL DEFENSE LOGO ON TRUCK. ATOMIC ENERGY COMMISSION ATOMIC TEST SITE. NEVADA DESERT. HOW OUR EVERYDAY IS EFFECTED BY ATOMIC TESTS. HEADQUARTERS. MODEL OF TEST. BOMB SHELTER TESTING. TRANSFORMER SUBSTATION. SURVIVAL INFORMATION. "MEDIA HILL".
Keywords: No keywords set
Historic Films Archive, LLC
Telephone: 631-477-9700
Toll Free: 1-800-249-1940
Fax: 631-477-9800
211 Third St, Greenport NY, 11944
Contact a Researcher!Enter a name for the new bin:
Select the bin you'd like to add the clip to:
Share this by emailing a copy of it to someone else. (They won’t need an account on the site to view it.)
Note! If you are looking to share this with an Historic Films researcher, click here instead.
Enter the security code you see below: |
Oops! Please note the following issues:
You need to sign in or create an account before you can contact a researcher.
Invoice # | Date | Status |
---|---|---|
|