00:00:50 6.53 |
ESTABLISHING SHOT OF WESTMORELAND, PENNSYLVANIA.
SMALL TOWN USA AS SEEN FROM DISTANT HILLTOP. CHURCH STEEPLE VISIBLE, CLICHE RURAL AMERICA. SPRING |
00:01:04 20.53 |
OFFICIAL CEREMONY. MR. SCHMUECKER HANDS JAMES
MCLERNIN CEREMONIAL "KEY-TO-THE-CITY"-TYPE KEY TO VW PLANT. OCT. 5, 1976. SYMBOLIC KEY TO WESTMORELAND PRESENTED TO VOLKSWAGEN PRESIDENT SCHUECKER BY GOV. SHAPP. |
00:01:20 36.53 |
HELICOPTER AERIAL OVER BEAUTIFUL ROLLING, GREEN
HILLS, PASTORAL. COUNTRYSIDE. |
00:01:46 62.53 |
"A NEW AMERICAN PLANT". VW PLANT IN FLOWER POT
ON MAP. PROMO POSTER. |
00:01:50 66.53 |
EXT SHOT OF "VW WESTMORELAND" HIGHWAY SIGN
ALONGSIDE ROAD. PLANT FACTORY IN BG |
00:01:52 68.53 |
INT EMPTY FACTORY. VW BUS DRIVES INTO VIEW, DUST
RISES FROM UNFINISHED FACTORY FLOOR. |
00:01:59 75.53 |
PAN EMPTY FACTORY
|
00:02:14 90.53 |
WELDING BEGINS. FACTORY CONSTRUCTION. MEN UP HIGH
IN METAL RAFTERS. SPARKS. WELDING SAFETY MASKS-SHIELDS. |
00:02:35 111.53 |
BLINKING RED WARNING LIGHT ATOP A LASER BEAM
TRANSMITTER. CAUTION |
00:02:38 114.53 |
LAYING RAILS IN FACTORY USING LASER TRANSIT.
CONSTRUCTION WORKERS IN HARD HATS |
00:02:43 119.53 |
LASER EYE GENERATOR. USED IN SURVEYING ACTIVITIES.
HAMMERING |
00:02:52 128.53 |
"ASSEMBLY BUILDING". ZOOM OUT TO BUILDING PLANS
|
00:03:01 137.53 |
STANDING OFFICE CONFERENCE. MEN LOOK AT PLANS, MAP
|
00:03:05 141.53 |
DISCUSSION AT DESK. GERMAN ACCENT
|
00:03:08 144.53 |
SUPERVISOR HANGS UP PHONE, LEAVES OFFICE. SOUND
BITE "I GOTTA GO, BE BACK IN A FEW MINUTES" |
00:03:12 148.53 |
EARTH MOVER. CONSTRUCTION EQUIPMENT DIGS UP DIRT.
BULLDOZER. DUMPS DIRT IN DUMP TRUCK. |
00:03:23 159.53 |
HELICOPTER AERIAL OF CONSTRUCTION SITE, OVER-PASS
|
00:03:32 168.53 |
BULLDOZER
|
00:03:39 175.53 |
AERIAL "POWER TOWER" CONSTRUCTION
|
00:03:48 184.53 |
CRANE PLACES TOP OF ELECTRICAL TOWER ON TOP OF
BASE. POWER LINE TOWERS. |
00:03:59 195.53 |
CRANE OPERATOR
|
00:04:01 197.53 |
WORKERS SIT ON METAL GIRDERS OF TOWER & ATTACH IT
WITH RACHET WRENCHES. |
00:04:04 200.53 |
WORKERS ON GROUND HOLDING ROPE TAUT
|
00:04:06 202.53 |
LOW ANGLE SHOT UP AT TOWER
|
00:04:08 204.53 |
SIGN: "TEMPORARY CONSTRUCTION HEADQUARTERS, NEW
STANTON, 14 MILLION DOLLARS, IMPROVEMENT PROJECT, BELL OF PENNSYLVANIA" |
00:04:11 207.53 |
MAN IN CHERRY-PICKER WORKS ON TELEPHONE-ELECTRICAL
WIRES-CABLES UP ON POLE |
00:04:18 214.53 |
"RABBIT HUTCH". (TEMPORARY BUILDING FOR PERSONNEL
INSTRUCTION). METAL BUILDING (HASEN HUTTEN). PICTURE OF RABBIT HITTING BEAR, & FROG WITH FLOWERS. |
00:04:22 218.53 |
INTERIOR. INSTRUCTION OF SUPERVISORY PERSONNEL. VW
RABBIT HOOD OPEN, MEN MULLING ABOUT. |
00:04:26 222.53 |
PAN OF WHITE CONSTRUCTION HARD HATS HELMETS
BEARING "RABBIT" LOGO. |
00:04:30 226.53 |
CU ENGINE, UNDER THE HOOD OF RABBIT
|
00:04:33 229.53 |
MEN LOOKING, LEARNING
|
00:04:36 232.53 |
CEMENT TRUCK DRIVES INTO BUILDING ENTRANCE.
|
00:04:48 244.53 |
CEMENT FLOOR CONSTRICTION UNDERWAY. DUMPING CEMENT
OUT OF CHUTE. |
00:04:52 248.53 |
CU MAN'S FEET WITH SHOVEL STANDS IN CEMENT
|
00:04:57 253.53 |
TRUCK DRIVES AWAY, NEW CEMENT FLOOR
|
00:05:12 268.53 |
LATEST PRESS INFORMATION IS GIVEN TO PRESS ON
TELEPHONE |
00:05:17 273.53 |
STANDING CONFERENCE. MEN LOOKING AT PLANS
|
00:05:23 279.53 |
SCENES OF NEW STANTON PLANT IN WINTER. SNOW COVERS
GROUND |
00:05:35 291.53 |
VW BUS DRIVES PAST, BIG BLACK TANKS IN BG, HILLS
OF SNOW |
00:05:44 300.53 |
WELDING, MOVING SHOT CAROUSEL WELDING SEQUENCE
WORKER RIDING BICYCLE THRU FACTORY CAROUSEL WELDER |
00:06:54 370.53 |
CRANE OPERATOR ADJACENT TO PLANT, CRANE LIFTING
ADJACENT TO PLANT |
00:07:02 378.53 |
EARLY RABBIT GREY METAL BODY BEING ROLLED THRU
PLANT |
00:07:13 389.53 |
CU DIGITAL MEASURING DEVICE
|
00:07:20 396.53 |
"SHANTYTOWN" CONSTRUCTION AREA
|
00:07:32 408.53 |
EXECUTIVE RUNNING AHEAD OF CAR CARRIER, HAULAWAY
BRINGING IN FIRST SHIPMENT OF RABBITS FROM GERMANY TO BE TRIMMED. DRIVING CARS OFF CARRIER |
00:08:02 438.53 |
DAWN, PLANT, EMPLOYEES ARRIVING TO WORK
|
00:08:18 454.53 |
INTERIOR PLANT MOVING SHOT LARGE CAR PARTS
|
00:08:35 471.53 |
UPHOLSTERY & DASHBOARD TRIM SEQUENCE, DASHBOARD
TEST |
00:09:00 496.53 |
EMPLOYEE INTERVIEW SEQUENCE: APPLICANTS AT TABLE
FILLING OUT FORM, WOMAN INTERVIEWING APPLICANTS, VIEW OF CARDS OVER SHOULDER |
00:09:29 525.53 |
RAILROAD & SWITCHING YARD SEQUENCE: F/G RAIL
LOWERED TO TRACK BED, RAIL CLAMP MACHINE DROPS RAIL, WORKERS FIT RAIL, LS F/G RAIL, PLANT IN B/G, |
00:09:48 544.53 |
CU TRAIN ENGINEER IN CAB. MOVING ACROSS RAILS
|
00:09:57 553.53 |
LS AUTUMN LANDSCAPE IN PENNSYLVANIA
|
00:10:01 557.53 |
HIGHWAY DIRECTLY IN FRONT OF PLANT, TRAFFIC
IN BOTH DIRECTIONS |
00:10:05 561.53 |
INTERIOR / FACTORY TRUCK DRIVES THRU WIDE OPEN
FACTORY SPACE |
00:10:12 568.53 |
WELDER IN TRIM AREA, FLOOR WELDING CONSTRUCTION
|
00:10:16 572.53 |
CHERRY PICKER IN F/G, FACTORY EXPANSE IN B/G
|
00:10:18 574.53 |
ANGLE UP ON CEILING LIGHTS SLOW OUT OF FOCUS
|
00:10:22 578.53 |
FOREMANS MEETING CONFERENCE
|
00:10:24 580.53 |
TRAIN, TRUCK UNLOADS BOXES OF BODY PARTS. CU
BOXES |
00:10:33 589.53 |
MAN POINTS TO PARTS LIST
|
00:10:35 591.53 |
CU STACKED PARTS, CAR BOTTOMS CU ANGLE DOWN ON
QUARTERPANEL PARTS |
00:10:39 595.53 |
LS F/G PRESSED METAL PARTS, B/G WELDING
|
00:10:41 597.53 |
WELDER IN GREY METAL FRAME, WELDING
|
00:10:45 601.53 |
STANDUP CONFERENCE CENTERING AROUND ELECTRIC CART
|
00:10:50 606.53 |
WELDING PART OF RABBIT BODY
|
00:10:51 607.53 |
EMPLOYEES ON BREAK DRINKING COFFEE, IN HARDHAT
AREA. CU OTHER SIDE OF THE TABLE, "SMILING JACK" CU HARDHAT EATING CANDY. |
00:11:03 619.53 |
FEMALE WELDER WELDING GREY METAL, SUPERVISOR
INSPECTS HER WORK |
00:11:11 627.53 |
HEALTHY SERVICE FACILITIES ON FACTORY FLOOR,
DOCTORS OFFICE |
00:11:13 629.53 |
FLOOR SWEEPER CLEANING FACTORY FLOOR
|
00:11:19 635.53 |
RABBIT BODIES ON CAROUSEL
|
00:11:29 645.53 |
BUSY EXECUTIVE AT DESK, SAMPLE STEERING WHEEL
ON DESK IN F/G |
00:11:31 647.53 |
LS ROW OF RABBITS READY FOR PAINT
|
00:11:33 649.53 |
3 HARDHATS ON COFFEE BREAK
|
00:11:35 651.53 |
OVERHEAD CONVEYOR TO PAINT SHOP
|
00:11:43 659.53 |
PAINT SHOP, PAINTER PAINTS DOOR OF PAINT CABIN
SECTION |
00:11:47 663.53 |
CU PAINTER WEARING MASK SPRAYING IN NOW FINISHED
PAINT CABIN |
00:11:53 669.53 |
SUPERVISORS, WORKERS SURROUND PAINTING TESTS
RABBIT INSIDE PAINT SHOP. LS TO MS WHITE PAINTED RABBIT READY TO EXIT. |
00:12:02 678.53 |
INSIDE RABBIT TRIMMER FITS WINDOW. CLAMPING
WINDSHIELD CHANNEL. BRUSHING WINDSHIELD RIM WITH GLUE. MAN TAPS WINDSHIELD INTO PLACE. |
00:12:46 722.53 |
LS RABBIT IN F/G, TRIM AREA IN B/G. CU NOZZLES,
WATER SPRAY TEST. FINISHED RABBIT DRIVES OUT OF TUNNEL. LS FACTORY IN B/G. |
00:13:03 739.53 |
VOLKSWAGEN OFFICIAL CEREMONY. NATIONAL ANTHEM
|
00:14:20 816.53 |
MS OFFICIAL SPEECHES. GOVERNOR OF PENNA., SEC.
OF TREASURY BLUMINGTHAL ?SP, MCLERNIN, GERMAN AMBASSADOR, MEMBERS OF BOARD OF MANAGEMENT ETC.. INTRODUCED. |
00:19:00 1096.53 |
SPEECHES BY TONI SCHMUECKER, PRESIDENT OF
VOLKSWAGEN, SECRETARY OF TREASURY BLUMINGTHAL?SP REPRESENTING PRESIDENT CARTER, GOVERNOR OF PA., MILTON SHAPP, TOM GLEASON, RICHARD DAUCH, |
00:33:43 1979.53 |
WHITE RABBIT EMERGES FROM UNDER CURTAIN, GRILL
AFFIXED ON CAR, MAKING IT FIRST VW RABBIT MADE IN AMERICA. LICENSE PLATE VW-1 |
00:34:41 2037.53 |
PRESENTATION OF SYMBOLIC KEYS & THANKS
|
00:35:32 2088.53 |
TAPE ENDS
|
Description: VOLKSWAGEN IN AMERICA. BACKGROUND FOOTAGE ON THE CONSTRUCTION & ACTIVATION OF THE FIRST AMERICAN VW FACTORY, SHOT BETWEEN APRIL 1977-APRIL 1978. THE "RABBIT" PLANT OPENING IN WESTMORELAND, PA. (EAST HUNTINGDON TOWNSHIP), 4/10/78. *SOME FOOTAGE REPETITIVE OF MI-17 THE VW RABBIT IS A MODERN, FUEL-EFFICIENT, PEPPY HATCHBACK SEDAN. SPACE-EFFICIENCY, SUB-COMPACT CAR. TRAVERSE MOUNTING OF A LIQUID-COOLED, FRONT-WHEEL-DRIVE ENGINE.
Keywords: No keywords set
Historic Films Archive, LLC
Telephone: 631-477-9700
Toll Free: 1-800-249-1940
Fax: 631-477-9800
211 Third St, Greenport NY, 11944
Contact a Researcher!Enter a name for the new bin:
Select the bin you'd like to add the clip to:
Share this by emailing a copy of it to someone else. (They won’t need an account on the site to view it.)
Note! If you are looking to share this with an Historic Films researcher, click here instead.
Enter the security code you see below: |
Oops! Please note the following issues:
You need to sign in or create an account before you can contact a researcher.
Invoice # | Date | Status |
---|---|---|
|