00:29:13 0.47 |
1960s PRISON INMATES WALK THROUGH HALLS OF JAIL.
|
00:29:37 24.47 |
CARD CATALOGUE WITH PHOTOS OF CRIMINALS.
|
00:29:57 44.47 |
MAP OF FEDERAL PRISON SYSTEM.
|
00:29:59 46.47 |
AERIALS OF MANY DIFFERENT PRISONS. PENITENTIARY,
REFORMATORY. PRISON CAMP. ETC.. |
00:30:14 61.47 |
CU CRIMINALS RECORDS IN CARD CATALOGE
|
00:30:41 88.47 |
PROCESS OF SEPARATING THE YOUNG CRIMINALS FROM
THE OLD TIMERS. MAP OF UNITED STATES. CU JUNCTURE OF ILLINOIS, MISSOURI, KENTUCKY, TENNESSEE, |
00:30:57 104.47 |
CU LIST OF CRITERIA SUCH AS SITE SIZE, COMMUNITY
FACTORS, TRANSORTATION ETC. CU PRESS REPORT. |
00:31:13 120.47 |
WIDE EMPTY FIELD. RIVERSIDE. WILDLIFE REFUGEE
SIGNS. CRAB ORCHARD NATIONAL WILDLIFE REFUGE. |
00:31:38 145.47 |
LS FEDERAL PENITENTIARY. HIGH METAL FENCE.
|
00:31:53 160.47 |
MAP OF UNITED STATES. 150 MILE RADIUS OF MARION,
ILLINOIS HIGHLIGHTED |
00:32:00 167.47 |
MODERN CHURCHES. FUNKY DESIGNS. CREATIVE
ARCHITECTURE |
00:32:14 181.47 |
MEETING OF ARCHITECTS. HELLMUTH, OBATA AND
KASSLBASUM. PRISON DESIGN |
00:33:04 231.47 |
PLANS FOR NEW PRISON. SPLIT LEVEL DESIGN.
BUILDING AND CONSTRUCTION. PLANS FOR JAIL. SPECIFICATIONS. MODEL OF DESIGN. |
00:34:22 309.47 |
LAND SURVEYOR.
|
00:34:27 314.47 |
GROUND BREAKING. BULLDOZER PUSHES DIRT.
|
00:34:35 322.47 |
CEMENT WALL PIECES. 7 FOOT WIDE WALL COMPONANTS.
|
00:34:40 327.47 |
CONSTRUCTION. PRE-CASTING WALLS FACE DOWN. WHITE
QUARTZ. HUGE WHEELS, SPOOLS OF WIRE, CABLE UNWIND. TENSION. CEMENT COMES OUT OF CHUTE. FOAM INSULATION. WIRE MESH. CEMENT MIXER. SMOOTHING CEMENT. PULLING BACK TARP. CRANE LIFTS SLABS OF WALL. BUFFED. WASHED OFF. WALLS ARE PUT UP. ERECTING WALLS |
00:39:39 626.47 |
MASSIVE STEEL GIRDERS. TRUCKS ARRIVE WITH STEEL
GIRDERS. CRANE OPERATOR PULLS LEVERS. RAISING STEEL GIRDERS. PUTTING INTO PLACE. |
00:40:59 706.47 |
CONSTRUCTION OF CONCRETE ROOF BEAMS. METAL RODS
AND BEAMS ARE TENSIONED & HELD IN POSITION WITH A CHOCK. PRISON CONSTRUCTION |
00:41:45 752.47 |
SURROUNDING SPACE PRESSURE FILLED.
|
00:42:03 770.47 |
LS PRISON UNDER CONSTRUCTION.
|
00:42:22 789.47 |
MAXIMUM DETENTION CELLS UNDER CONSTRUCTION
WELDING STEEL WALLS. SOLDERING |
00:42:35 802.47 |
VOCATIONAL SHOP PARTITIONED WITH CONCRETE BLOCK
BUILDING CONCRETE WALLS. |
00:42:42 809.47 |
INSPECTORS CHECKING CONSTRUCTION FOR FLAWS.
CU WRITING IN PAD. QUALITY CONTROL. |
00:42:57 824.47 |
SOLDERING SECURITY FRAME. STEEL BARS ACROSS
WINDOWS. WELDING. |
00:43:12 839.47 |
CU CRANKING OPEN WINDOW. LOUVORED WINDOWS HIDES
STEEL CROSS MEMBERS |
00:43:20 847.47 |
CONSTRUCTING SKYLIGHTS IN LIBRARY
|
00:43:35 862.47 |
LS FINISHED PRISON
|
00:43:37 864.47 |
MINIMUM SECURITY INMATES COME OFF BUS. PRISON
GUARD INSPECTS THEIR CARDS, PHOTO ID. |
00:43:57 884.47 |
PRISON CELLS. TOILET. PRISONER SITS ON BED IN HIS
JAIL CELL. |
00:44:07 894.47 |
CU GUARD PULLS LEVER. ALL CELL DOORS CLOSE.
|
00:44:14 901.47 |
INTERIOR JAIL CELL. PRISONER LAYS DOWN ON BED
|
00:44:24 911.47 |
CIRCULAR SINK. PRISONER WASHES HIS HANDS.
|
00:44:31 918.47 |
PRISONER COMBS HIS HAIR.
|
00:44:36 923.47 |
PRISONER LOOKS OUT QINDOW SMOKING A CIGARETTE
|
00:44:40 927.47 |
LS WATER TOWER. EXTERIOR BUILDING MONTAGE
|
00:44:56 943.47 |
PRISONER SWEEPING WITH A BROOM
|
00:44:58 945.47 |
ROUND CHAPEL. ALTAR ROTATES. FOR CATHOLIC MASS
AND PROTESTANT SERVICE. |
00:45:07 954.47 |
PRIEST GIVES MASS
|
00:45:12 959.47 |
PRISON DOCTOR'S OFFICE.
|
00:45:17 964.47 |
PRISONERS PLAY SHUFFLEBOARD
|
00:45:21 968.47 |
HS PING PONG GAME
|
00:45:28 975.47 |
PLAYING BASEBALL.
|
00:45:32 979.47 |
PRISONER SITS OUTDOORS READING
|
00:45:36 983.47 |
PRISONER SELECTS A BOOK FROM SHELF IN PRISON
LIBRARY. PRISONER SITS IN LIBRARY READING STUDYING |
00:45:43 990.47 |
PRISONERS IN CAFETERIA. IN LINE. EATING.
|
00:45:57 1004.47 |
ELECTRICAL AND COMMUNICATION NETWORK. LOOK-OUT
TOWER. WIRES. GUARDS TALK ON PHONE. |
00:46:16 1023.47 |
BUS FILLED WITH INMATES ARRIVES. TRANSFER INMATES
|
Description: THIS FILM DEPICTS CONSTRUCTION, FROM PLANNING TO COMPLETION, OF THE NEW UNITED STATES MAXIMUM SECURITY PENITENTIARY AT MARION, ILLINOIS. THE FILM GIVES EMPHASIS TO THE CONCERN FOR EDUCATION AND REHABILITATION AS IMPORTANT REQUIREMENTS IN ENVIRONMENTAL PLANNING AND CONTROL. CRIME AND CRIMINALS. POLICE. PRISONS. CORRECTION. ARCHITECTURE.
Keywords: No keywords set
Historic Films Archive, LLC
Telephone: 631-477-9700
Toll Free: 1-800-249-1940
Fax: 631-477-9800
211 Third St, Greenport NY, 11944
Contact a Researcher!Enter a name for the new bin:
Select the bin you'd like to add the clip to:
Share this by emailing a copy of it to someone else. (They won’t need an account on the site to view it.)
Note! If you are looking to share this with an Historic Films researcher, click here instead.
Enter the security code you see below: |
Oops! Please note the following issues:
You need to sign in or create an account before you can contact a researcher.
Invoice # | Date | Status |
---|---|---|
|